Business Hours
- Mon-Fri: 7:00 AM - 7:00 PM
- Sat: 8:00 AM - 7:00 PM
- Sun: 8:00 AM - 6:00 PM
You can still text outside business hours and receive a prompt reply

Free preliminary residential permit guidance
Find the likely permit authority and permit path for your planned residential remodel before demolition begins.
Enter the property address, describe the work, and answer a few scope questions. The checker will help you identify:
Takes approximately two to three minutes. You do not need to submit contact information to see the preliminary result.
Loading the checker…
Preliminary educational guidance from Big Horn Remodeling’s published, versioned rule set (questions v2026.08.03) and official jurisdiction sources, not a permit, approval, or legal opinion. Location checks run on our server against Clark County GIS; your address is never used for analytics and is shared with our team only if you ask us to follow up.
This checker provides preliminary educational guidance. It is not a permit, code interpretation, engineering opinion, legal opinion, or final determination by a government agency. Requirements depend on the property, project details, adopted codes, and the authority having jurisdiction. Always verify the result with the building department identified in your report.
Researching a contractor instead? Use our Nevada contractor license search, or look up a property’s history in the Las Vegas permit search.
Big Horn Remodeling is not affiliated with, sponsored by, or endorsed by any city or county building department. Results are preliminary educational guidance, not a permit, approval, or legal opinion.
Reviewed by Nathan Nehoraoff, Nevada B-2 General Building Contractor, License #0091383. Rules and sources last updated August 5, 2026.
Ask forNathan
You can still text outside business hours and receive a prompt reply
Choose your preferred channel for project questions, photos, scope notes, scheduling, and faster day-to-day communication updates.
A residential remodel may require a permit when it constructs, enlarges, alters, repairs, moves, demolishes, or changes part of a building, or when it installs or changes regulated electrical, gas, mechanical, or plumbing systems. A finish-only update is a different permit question from work that changes walls, wiring, piping, gas, ventilation, exterior openings, floor area, or the use of a space.
The project name alone does not decide the answer. Two homeowners may both call their project a “small remodel,” while one is replacing finishes and the other is relocating plumbing, adding circuits, opening a wall, or changing ventilation. The scope and jurisdiction matter more than the label.
This checker is designed to organize those facts into a preliminary roadmap. It does not replace the building department’s decision.
The categories below are screening questions, not automatic final determinations. Select every type of work that may be part of the project, including work hidden behind walls, ceilings, floors, cabinets, tile, or fixtures.
Permit and plan review should be investigated when a project may:
Clark County's general permit guidance includes construction, enlargement, alteration, repair, movement, demolition, and changes in occupancy.
Permit review may apply when the project adds, relocates, replaces, or alters:
Some jurisdictions offer simplified or no-plan processing for narrowly defined electrical work. That does not necessarily mean the work is permit-exempt. For example, the City of Las Vegas currently lists selected panel or service changes and qualifying minor electrical work among online permits that do not require plan submittal.
Permit review may apply when work changes:
The permit question should be reviewed before demolition when the planned design requires piping to move, even if the visible fixture change appears small.
Permit review may apply to:
Both Clark County and the City of Las Vegas publish streamlined processing for selected equipment-replacement scopes, but those programs still involve permits and defined eligibility rules.
Additional review is likely when a project changes:
Depending on the project, building approval may be only one layer. Planning, zoning, design review, variances, fire review, utilities, public works, or HOA approval may also apply. The City of Las Vegas notes that planning and development approvals can precede or accompany the building process.
A whole-home or multi-room scope usually crosses several of the categories above at once, which changes both the permit and the plan-review path.
Plan a whole-home or multi-room remodel, or plan a permitted bathroom remodel.
A common source of confusion is the difference between:
For example, the City of Las Vegas publishes an online list of defined permits that can be issued without plan submittal. The list includes selected same-for-same equipment replacements, repairs, panel or service changes, and qualifying minor electrical work. The city states that work outside that list requires plans to be submitted and reviewed.
Clark County also publishes Simple Online Permit categories for selected mechanical and plumbing work. A streamlined or no-plan pathway is still a permit pathway.
A project may qualify for an online or simplified permit while still requiring an application, fees, inspections, licensed trade involvement, or other conditions. The checker result reports permit status and plan-review status separately.
Likely not required, likely required, possible, manual review, or unsupported.
Building, electrical, plumbing, mechanical, gas, fire, demolition, grading, zoning, health, utility, or right-of-way.
No plans likely, plans likely, engineering may be required, or unknown.
HOA, zoning and setbacks, fire, health, utility, public works, or special property conditions.
Kitchen scopes are the classic case, so if that is your project, read the Las Vegas kitchen permit guide. Commercial and tenant work follows a different path entirely: commercial remodeling permit coordination and tenant improvement permits and buildouts.
Permit authority is based on the property’s jurisdiction, not simply the mailing city or ZIP code. A Las Vegas mailing address does not by itself establish whether the City of Las Vegas or unincorporated Clark County is the correct permit authority.
Permit requirements in the Las Vegas area are set per jurisdiction, and the jurisdiction is decided by the parcel, not the mailing address. A “Las Vegas, NV” envelope can belong to the City of Las Vegas or to unincorporated Clark County communities like Paradise, Spring Valley, or Enterprise, each with its own permit counter, forms, and fees.
That is why the checker starts with your address: it resolves the parcel against the county boundary map on our server before any permit question is asked. Boulder City, Mesquite, and Nellis AFB run their own processes, for those, the tool names the correct authority rather than guessing.
Curious what has been permitted at a property before? Run it through our address permit search , it reads the same jurisdictions’ public records.
Properties inside incorporated City of Las Vegas boundaries generally use the city's Building & Safety process. The city directs applicants to confirm city jurisdiction, determine whether plans are required, and estimate fees before applying. Planning, zoning, design, variance, or land-development review may also apply.
Many properties with “Las Vegas” mailing addresses are outside the incorporated city and fall under Clark County. Clark County's general guidance says a permit is required before regulated construction, alteration, repair, demolition, occupancy change, or electrical, gas, mechanical, and plumbing work is performed.
Henderson operates its own development and building-permit systems. Its Virtual Counter offers online over-the-counter review for selected building and fire permit categories, including individual trade permits and qualifying small remodel scopes. Eligibility for that review pathway is not a permit exemption.
North Las Vegas maintains its own Permit Application Center, Building Safety division, application forms, plan-review process, inspection scheduling, and Citizen Self-Service portal.
Boundary notice.The checker’s jurisdiction match is preliminary. Boundary data, parcel conditions, special districts, manufactured-housing authority, and unusual properties may require direct agency confirmation.
The checker standardizes the address and compares it with available jurisdiction data to identify the most likely permit department.
The checker evaluates what is changing rather than relying only on labels such as “kitchen remodel” or “bathroom update.”
The result distinguishes the likely permit requirement, likely permit types, likely plan-review requirement, potential engineering or professional-design needs, potential additional approvals, and issues requiring official confirmation.
Each result includes a preliminary status, a confidence indicator, the reason for the result, the jurisdiction assumed, relevant official sources, a last-reviewed date, questions to resolve before work begins, and links to the appropriate next step.
Each rule carries its jurisdiction, project category, trigger condition, official source or documented professional interpretation, effective or review date, reviewer, version number, confidence level, and notes about exceptions and escalation.
Results are deliberately cautious. The checker says “appears unlikely” or “likely required because,” never a flat yes or no. When a project hits conditions automation should not decide, such as unknown load-bearing walls, fire-rated assemblies, ambiguous gas work, commercial life safety, or concealed unpermitted work, it stops and recommends a professional review instead.
The rule set is built from and cites these official sources. Your result lists the specific sources behind its reasons, with their verification dates.
Jurisdiction boundaries are resolved against Clark County’s public GIS map services. Rule set 2026.08.03-mvp2, reviewed by Nathan Nehoraoff, Nevada B-2 General Building Contractor, License #0091383. Rules and sources last updated August 5, 2026. Spot something a jurisdiction changed? Email nathan@bighornremodeling.com with the source link and we will review it against the rule set.
The selected scope appears to include work commonly regulated through a building, electrical, plumbing, gas, mechanical, or related permit process.
What to do next
The answers indicate finish-only or like-for-like work with no identified regulated system, structural, exterior, area, or occupancy change.
What to do next
The project may fall within a published online, over-the-counter, or no-plan permit category.
What to do next
The checker cannot provide a reliable preliminary classification because the project includes uncertainty, unusual property conditions, possible structural work, a change of use, shared or rated construction, concealed unpermitted work, or another exception.
What to do next
Use the result as the beginning of project planning, not the end.
Need a contractor to turn the permit roadmap into a buildable scope? Big Horn Remodeling can review the property, proposed work, likely jurisdiction, trade coordination, and permit pathway as part of residential-remodel planning.
Request a project consultation or verify a Nevada contractor.
This checker is designed primarily for work that has not started.
If construction is already complete, a permit has expired, an inspector issued a correction, a title or lender review found an open record, or code enforcement identified unpermitted work, use the retroactive-permit resource instead. That process may involve record research, existing-condition documentation, as-built drawings, engineering, corrective work, inspections, and final approval.
Get help with existing or unpermitted work
If the question is whether a permit already exists for the address, use the property permit-history tool: search existing permits by address.
Still have questions about your project? Click the button to get a free consultation and our team will help you with scope, timeline, and next steps.