Big Horn Remodeling
Completed Jimmy John's storefront at 7785 N Durango Drive in Las Vegas

From Dental Office to Jimmy John's: A 1,200-SF Las Vegas Franchise Conversion

Big Horn Remodeling converted an existing dental office at 7785 N Durango Dr., Suite 140 into a fully built Jimmy John's franchise location, replacing almost every interior system while coordinating City of Las Vegas approvals and Jimmy John's corporate standards.

Project Type

Restaurant Conversion

Investment

Approx. $300,000

Timeline

Approx. 3 months

Permit

City & Franchise

Client Goal

Convert a segmented dental office into a fully functioning Jimmy John's restaurant while satisfying City of Las Vegas requirements and the franchise's detailed corporate standards.

Finished Result

A completed 1,200-SF franchise location with restaurant grease waste, new food-service plumbing and electrical distribution, custom refrigeration, rerouted fire sprinklers, an accessible restroom, and approved front- and back-of-house finishes.

Completed Jimmy John's storefront at 7785 N Durango Drive in Las Vegas
Finished franchise signage is integrated into the shopping-center facade. Behind this storefront, the team converted a former dental office into a 1,200-SF food-service space with new restaurant infrastructure.

Photo 1 of 12

Completed in June 2025, this approximately 1,200-SF commercial conversion at 7785 N Durango Dr., Suite 140 replaced nearly every interior system in a former dental office to create a fully built Jimmy John's franchise location.

Big Horn Remodeling coordinated the full required permit and inspection package through the City of Las Vegas together with Jimmy John's plan approval. Active construction took approximately three months, and the approximately $300,000 project value generally excluded restaurant equipment and signage.

The Former Dental Office Could Not Simply Be Adapted For Food Service

This suite began as a finished dental office, not a restaurant. It had individual rooms, a suspended ceiling system, and only limited plumbing that could be useful for a food-service operation. Very little of the interior could be retained. Some mechanical components were reusable, but the partitions, electrical distribution, plumbing layout, finishes, and most of the existing build-out had to be removed so the restaurant could be reconstructed around Jimmy John's operating plan.

That starting condition mattered more than the 1,200-square-foot size. A compact space can still require a heavy construction scope when the prior use does not have grease waste, commercial warewashing plumbing, restaurant refrigeration, production-line power, food-service finishes, or the life-safety layout required by the new plan.

Completed Jimmy John's dining area and service counter in northwest Las Vegas
This wide view shows the open approximately 14-foot interior volume, customer seating, production counter, pickup zone, black-and-white tile, and franchise graphics working as one approved layout.

The 750-Gallon Grease Interceptor Forced A 10-Foot-Deep Parking-Lot Excavation

The grease interceptor became one of the project's main critical-path items because the former dental office had no restaurant grease-waste system. A 750-gallon precast interceptor had to be installed outside the suite through the parking lot. The precast unit required roughly three weeks of fabrication and lead time before it could be set.

Installation required opening an area of the parking lot approximately 10 feet by 12 feet and excavating to roughly 10 feet deep. During excavation, the crew encountered caliche rock, which required specialty equipment rather than ordinary digging. Once the excavation and piping were ready, the interceptor was lowered into place by crane, inspected, backfilled, and protected before the concrete surface was restored over the installation.

Why this mattered to the schedule

The interceptor was not a cosmetic line item that could be finished later. Food-service plumbing depended on the grease-waste path, and the precast lead time, deep excavation, caliche removal, crane set, inspections, and surface restoration all had to be sequenced before the project could move cleanly into finish work.

Food-Service Waste And Ordinary Sanitary Waste Were Routed As Separate Systems

The plumbing plan separated grease-producing restaurant waste from ordinary sanitary fixtures. The final routing followed how each fixture would be used rather than sending every drain through the interceptor.

Fixture or use
Waste route
Food preparation, warewashing, and other non-handwashing sinks
Grease-interceptor system
Handwashing fixtures, restroom lavatory, and toilet
Ordinary sanitary-waste system; these fixtures bypassed the grease interceptor

The conversion also required new plumbing distribution throughout the store, floor cleanouts, a mop sink, equipment connections, and the water supply needed for restaurant refrigeration and support equipment. Because the old dental-office plumbing did not match the franchise layout, the new piping was built around the final sink and equipment locations instead of forcing the restaurant plan to conform to the old office walls.

A Load Calculation Kept The Existing 200-Amp Service In Place

The project did not automatically replace the electrical service simply because the use changed. The existing 200-amp panel was evaluated with load calculations against the proposed restaurant equipment and was determined to be sufficient. That allowed the project to keep the service while rebuilding distribution for the new restaurant layout.

Dedicated circuits were added for restaurant equipment, including ovens and high-speed bread-toasting equipment requiring 208/220-volt power. The electrical scope also had to account for new lighting, emergency and exit systems, walk-in refrigeration, digital menu boards, POS equipment, wall-mounted to-go ordering, security cameras, audio, and CAT6/data infrastructure.

Jimmy John's walk-in refrigeration and 200-amp electrical panel in completed Las Vegas conversion
Electrical distribution — The custom walk-in area sits next to the retained 200-amp panel. Load calculations showed the service could remain while new restaurant circuits and refrigeration requirements were added.
Jimmy John's back office with CAT6 network rack security and POS support infrastructure
Low-voltage infrastructure — The network rack and back-office equipment support CAT6, POS, wall-mounted ordering, security cameras, and audio systems coordinated with the construction scope.

Removing The Suspended Grid Opened The Approximately 14-Foot Interior Volume

The office ceiling system did not fit the Jimmy John's design. The suspended grid was removed so the finished store could use the approximately 14-foot interior volume, with drywall and hard-lid construction coordinated around the trusses, soffits, and franchise details. The resulting ceiling condition makes the front of house feel significantly more open while still giving the menu board, lighting, and branded red soffit precise architectural locations.

This was not only a visual change. Opening the ceiling changed where lighting, fire-sprinkler components, mechanical elements, low-voltage systems, and franchise finishes had to land. Those systems were coordinated against the architectural elevations instead of being treated as independent installations.

Custom Walk-In Cooler And Freezer Boxes Changed The Fire-Sprinkler Layout

Jimmy John's required custom walk-in refrigeration built to the franchise layout. The store received custom boxes for both a walk-in cooler and a walk-in freezer. Because the former dental-office layout was completely different, the fire-sprinkler system also had to be rerouted throughout the store to match the new rooms, circulation, and ceiling conditions.

The refrigeration boxes were included in that coordination. Fire-protection components were routed into the cooler and freezer areas as required, rather than allowing the refrigeration installation to become an isolated vendor scope that conflicted with the rest of the ceiling and life-safety work.

Jimmy John's Required A Plan Set Nearly Twice The Typical Size

Franchise approval added a second level of plan review beyond the local permit process. Jimmy John's required highly detailed drawings and full elevations that spelled out items a more typical restaurant set may leave to finish schedules or field coordination. A plan set that might otherwise be around 15 sheets for a comparable small restaurant grew to nearly twice that size because the franchise wanted the construction details documented for approval.

The drawings addressed paint colors, finish transitions, tile schedules, soffit dimensions, equipment and sink locations, custom millwork, and other brand-specific requirements. Jimmy John's was particular about the details - down to finish selections and grout spacing - and approved the plans as part of the process. That meant the field team had to satisfy both the City of Las Vegas permit documents and the franchise standards at the same time.

Jimmy John's custom service counter chip display and digital menu board installation
Custom chip millwork and counter dimensions were built from franchise shop drawings. The POS devices, pickup station, lighting, and exact red soffit geometry also had to match the approved plan package.

Front-Of-House Branding And Back-Of-House Durability Were Detailed For Different Jobs

The finish package was deliberately different between customer-facing and production areas. Tile and finish products were ordered from approved sources and installed to the franchise's required details rather than substituted with visually similar local products.

Area
Materials and features
Project role
Front of house
Polished concrete; Jimmy John's approved black-and-white subway tile; branded wall graphics; red architectural elements; custom millwork
Customer-facing finishes and products followed the franchise's approved sources and installation details.
Back of house
Quarry tile; FRP where required; white cleanable wall finishes; stainless equipment interfaces; three-compartment sink; mop sink; floor-level plumbing access
Durable, cleanable surfaces support food production, warewashing, refrigeration, and daily maintenance.
Restroom
Wall tile; cove/base detailing; ADA-related clearances and grab bars
Accessibility and cleanable finish requirements were coordinated with the approved plan.
Jimmy John's dining area with black subway tile and branded wall graphic in Las Vegas
Front of house — Black tile wainscot, the Super Seal wall graphic, polished concrete, and the open ceiling express the franchise finish standard in the customer area.
Jimmy John's back-of-house production line with quarry tile flooring in Las Vegas
Back of house — Quarry tile, stainless equipment, bread racks, and cleanable wall finishes distinguish the durable production zone from the customer area.

The $300,000 Scope Was Intentionally Close To Turnkey

The client wanted an estimate that covered as much of the construction scope as practical so they would not have to manage a long list of owner-provided construction items. The approximately $300,000 project value therefore covered the broad build-out scope shown below.

Scope treatment
What it included
Included in Big Horn scope
Demolition; parking-lot site work; plumbing and electrical distribution; walls and ceilings; finish construction; custom millwork; walk-in cooler and freezer boxes; fire-sprinkler changes; low-voltage coordination; permits, inspections, and closeout.
Generally excluded
Restaurant equipment and signage.

That distinction is important when comparing project costs. The number reflects the scope this owner asked Big Horn Remodeling to carry; it should not be used as a generic price-per-square-foot benchmark for other restaurants with different starting conditions, equipment, grease, ventilation, or landlord requirements.

Three Months With Permitting Interceptor And Refrigeration On The Critical Path

Active construction took approximately three months. The schedule was controlled less by finish installation than by three dependencies that had to be planned early: permitting and approvals, the grease-interceptor fabrication and installation sequence, and the custom refrigeration package. Those items affected underground work, inspections, fire-protection coordination, and when surrounding construction could be closed.

The project is a useful example of why a small restaurant conversion can have a complex schedule. Square footage alone did not dictate the duration; the critical path came from the infrastructure that had to be added to a prior-use suite and from the level of franchise documentation required before construction could be approved and completed.

What This Dental-To-Restaurant Conversion Proves

  • Previous use can matter more than square footage. A finished office can require more restaurant infrastructure than an empty shell if the existing utilities do not support food service.
  • Electrical capacity should be verified, not assumed. The 200-amp service stayed because load calculations showed it could support the planned equipment.
  • Grease, refrigeration, and approvals belong in preconstruction. On this project, those three items controlled the schedule more than the visible finishes.
  • Franchise construction is a coordination exercise. Corporate standards, local permits, equipment layouts, fire protection, MEP, and finish tolerances all had to agree before turnover.

For the broader construction service - including restaurants, bars, commercial kitchens, grease systems, and food-service MEP - see Big Horn Remodeling's Las Vegas Restaurant & Bar Build Outs. This project page stays focused on what happened in this specific conversion.

Jimmy John's - 7785 N Durango Dr., Suite 140, Las Vegas, NV 89131

Permitting jurisdiction was the City of Las Vegas. The project occupies Suite 140 in a Centennial Hills shopping center on N Durango Drive and was completed in June 2025. The full address is shown because it identifies a public operating franchise location, not a private residence.

The public commercial address centers the map; the card identifies the surrounding community.

Planning A Similar Restaurant Conversion?

Big Horn Remodeling can review the prior use, grease-waste path, food-service MEP, refrigeration, fire protection, permit coordination, and franchise requirements before construction starts.

Frequently Asked Questions

What was in the suite before Jimmy John's?
The approximately 1,200-square-foot suite was a dental office with segmented rooms, a suspended ceiling system and very little infrastructure that could be reused for restaurant food service. Some mechanical components remained, but most of the interior build-out, plumbing and electrical distribution had to be replaced.
How much of the original dental office was reused?
Very little. The project reused selected mechanical components, while the interior layout, most utilities, finishes and food-service infrastructure were rebuilt around Jimmy John's approved restaurant plan.
How was the 750-gallon grease interceptor installed?
The parking lot was opened to create an excavation roughly 10 feet by 12 feet and about 10 feet deep. Caliche rock required specialty removal equipment. After the precast interceptor arrived, it was set by crane, connected, inspected, backfilled and covered as the concrete surface was restored.
Which plumbing fixtures were routed through the grease interceptor?
Waste from sinks used for food preparation, warewashing or other non-handwashing tasks was routed through the grease system. Handwashing fixtures and restroom sanitary plumbing, including the restroom lavatory and toilet, bypassed the grease interceptor.
Did the restaurant need a larger electrical service?
No. The existing 200-amp service was evaluated with load calculations and found sufficient for the planned equipment. New distribution and dedicated circuits were still required, including 208/220-volt circuits for ovens and high-speed toasting equipment.
Why was the Jimmy John's drawing set so detailed?
Jimmy John's required corporate plan approval in addition to local permitting. The franchise wanted full elevations and detailed documentation for paint, tile, soffits, equipment locations, millwork and other brand standards. The final package was nearly twice the size of a more typical small-restaurant plan set.
What changed in the fire-sprinkler system?
Because the new restaurant layout and custom walk-in cooler/freezer boxes were completely different from the former office layout, fire-sprinkler components had to be rerouted throughout the store and coordinated into the refrigeration areas.
How long did the conversion take?
Active construction took approximately three months. The main schedule drivers were permitting and approvals, the grease-interceptor fabrication/installation sequence and the custom refrigeration package.
What did the approximately $300,000 project value include?
The owner asked for a broadly inclusive construction estimate. The project value covered most of the construction scope, including demolition, site work, MEP, finishes, millwork, custom refrigeration boxes, fire-sprinkler changes, low-voltage coordination, permits and closeout. Restaurant equipment and signage were generally excluded.
When was the project completed?
The Jimmy John's conversion at 7785 N Durango Dr., Suite 140 was completed in June 2025.

Contact Us Today!

Nathan Nehoraoff - Owner of Big Horn Remodeling, Nevada B-2 License #0091383
online

Ask for Nathan

Business Hours
  • Mon-Fri: 7:00 AM - 7:00 PM
  • Sat: 8:00 AM - 7:00 PM
  • Sun: 8:00 AM - 6:00 PM

You can still text outside business hours and receive a prompt reply

Contact Channels

Choose your preferred channel for project questions, photos, scope notes, scheduling, and faster day-to-day communication updates.